Frank Crowe
Frank Crowe walked away from his accomplishment at Hoover Dam with a $350,000 bonus. He went on to build four more dams, but Hoover would stand as his crowning achievement.

Who helped build the Hoover Dam?

A consortium called Six Companies Inc., which included Bechtel, won the right to build the concrete arch dam, at a cost of nearly $49 million—a staggering amount in the early 1930s (roughly equivalent to $860 million today).

Who was the lead architect of the Hoover Dam?

Hoover Dam
Coordinates 36°0′56″N 114°44′16″WCoordinates: 36°0′56″N 114°44′16″W
Built 1933
Architect Six Companies, Inc. (structural), Gordon Kaufmann (exteriors)
Architectural style Art Deco

Who sponsored the Hoover Dam?

Herbert Hoover, the Nation’s 31st President. When construction of the dam was initiated, on September 30, 1930, Secretary of the Interior Ray Lyman Wilbur ordered that the dam to be built in the Black Canyon of the Colorado as part of the Boulder Canyon Project Act was to be called Hoover Dam.

What are the specifications of the Hoover Dam?

Serves 8 million people in Arizona,Nevada and California

  • Downstream releases of water from Lake Mead at Hoover Dam provide water for both municipal and irrigation uses.
  • Water released from the Hoover Dam eventually reaches the All-American Canal for the irrigation of over 1,000,000 acres of land in Southern Arizona,California,and Mexico.
  • How they built the Hoover Dam?

    4.4 million cubic yards of concrete

  • 88 million pounds of plate steel and outlet pipes
  • 6.7 million pounds of pipe and fittings
  • 45 million pounds of reinforced steel
  • Does Hoover Dam have floodgates?

    The bill, one aide said, would give the president the power to force “the system that controls the floodgates to the Hoover Dam” to cut its connection to the net if the government detected an

    Does the Hoover Dam have a water generator?

    There are a total of 17 hydroelectric generators at the dam. The powerplant’s generators began transmitting electricity in 1936, reaching Los Angeles, California 266 miles to the southwest. The funds generated from electric power transmission enabled repayment of the 50-year construction loan for the dam. Today, power generation pays for the Hoover Dam’s multi-million dollar annual maintenance budget.